Setting up a Brick Paver Walkway or Plaster Brick Wall

The use of Installing a Brick Paver Walkway or Brick Conveyor Belt or Pavers to create a pathway or outdoor patio complements a home in a manner in which is unrivaled. It adds a level of quality and beauty to a home entrance that can not be achieved with either concrete or asphalt. Brick and Pavers likewise can be found in several colors and shapes enabling for special color pattern and patterns to be achieved. In addition, installing a Brick or Paver pathway does not necessarily need a pro. With some fundamental knowledge and a relatively simple sidewalk plan, a homeowner is capable of carrying out such a project.

The secret to installing a Brick or Paver Walkway is to first effectively prepare the location where the bricks/pavers are to be set up. The location needs to be removed a minimum of a foot down, getting rid of all topsoil and clay soil. In addition, string lines should be strung on each side of the pathway. The string lines show the ended up height of the sidewalk.
When the location has been dug, 3/4" gravel stone need to be laid in and tamped down securely. 2" of sand, or stone dust ought to be spread out over the gravel. Once again the sand/stone dust should be tamped down. Stone dust is chosen. The height in between the tamped down sand and the stringline need to equal the thickness of the brick or paver.

Now that you have a steady base, put a 1" pipe or ledger board the length of the walkway on either side of the walkway. Then utilizing a flatedge, e.g. a 2"x4" board, slide it over the two lengths of the pipe/ledger board. In doing this you will develop a level area to lay the bricks/pavers.

Now location on the level sand/stone dust strips of plastic brick borders. Install a run on both sides of the prepared location. These strips will act as your walkway border and help to maintain the integrity and shape of the pathway.

The key to laying the bricks/pavers is to make sure that they interlock with each other. Always stagger nearby rows of bricks by 1/2 of a brick to interlock them. This will once again assist keep the integrity of the pathway.

Inevitably bricks/pavers will require to be cut or split when constructing the walkway. To actually cut/split the brick/paver, lay it in a bed of sand and location the chisel at a 75 degree angle over the spot where you want to break the brick. If your sidewalk has curves you will need to buy/rent a wetsaw.

After setting up the bricks, construct up the outside edges with extra sand, and then shovel in the topsoil and pack down strongly.
Spread stone dust over the new walkway and sweep into the fractures. Repeat this process a couple of times to ensure the cracks are fully filled. This will complete the interlocking of the bricks and assist to get rid of any weed growth. Simply add lawn seed to the outside edges and you need to have a gorgeous entryway to your house within a number of weeks.


In addition, installing a Brick or Paver walkway does not always require a pro. The secret to installing a Brick or Paver Walkway is to first effectively prepare the location where the bricks/pavers are to be set up. Now that you have a stable base, place a 1" pipe or ledger board the length of the walkway on either side of the pathway. These strips will act as your sidewalk border and assistance to maintain the stability website and shape of the walkway. Undoubtedly bricks/pavers will need to be cut or divided when constructing the walkway.